Services
We offer customized dewatering and drainage solutions along with comprehensive turnkey services, needed to manage the most demanding of dewatering and pumping solutions.
Our service offerings includes:
-
WellPoint Dewatering.
-
Concrete Pump Services.
-
Screeding Works.
-
Plastering Works
To perform professional Dewatering services to our various customers, we have an extensive and specialized inventory of superior dewatering, pumping and support equipment to facilitate the most demanding of dewatering projects.



Describe your image

DEWATERING, CONCRETE PUMP, SCREEDING AND PLASTERING WORKS.
Dewatering Logistics offers the installation, operations and removal of temporary ground water extraction and aquifer depressurisation systems.
Our construction dewatering services and specialties includes:
-
Vacuum WellPoint Dewatering Systems
-
Vacuum Eductor Dewatering Systems
-
Large Diameter suction and Vacuum Wells
-
Sump Well and Trench Drain Dewatering
DEWATERING SERVICE DELIVERY PHASES
For us to offer our dewatering and pumping services, we use the following phases.
We shall require specific information and Data as shall be required in preparing a proposal for each phase of the dewatering plan.
-
Design Phase
-
Tender Phase
-
Construction and Operational Phase.
DESIGN PHASE REQUIREMENTS
-
Consulting Engineers Soil Investigation report
-
Grain size analysis and permeability test results.
-
Stratification and penetrability of the soil
-
Hydrology of the area.
-
-
Construction Schedule
-
Space limitation of site and surrounding structures.
-
The Method of excavation and shoring where needed
-
Recommendation for preferable dewatering system for the specific project
-
Dewatering to be specified as a separate item on the BOQ
TENDER PHASE REQUIREMENTS
-
Presentation to client, of our understanding of your requirement.
-
Establishment and de-establishment
-
Dewatering System design methods
-
Proposal of the appropriate dewatering method, which could include a combination of methods
-
Size and type of dewatering pumps required
-
Daily supervision and attendance
-
General conditions of proposal
CONSTRUCTION AND OPERATIONAL STAGE REQUIREMENTS
-
Installation of dewatering plant and systems
-
Draw down- Allow for a minimum of 7 days pumping before excavation
-
Operate and maintain the dewatering system on a 24/7 hour basis
-
Constant on going monitoring of the effectiveness of system
-
Provide immediate assistance and solutions to unexpected problems
-
Removal of dewatering plants and equipment on completion of project.
-